Jump to content

My new layout


walkingthedog

Recommended Posts

The locos.

Waiting for number plate for black pannier tank and name plates for Peckett.

 

/media/tinymce_upload/808c05045c3f3880cd1ac382138124b7.JPG/media/tinymce_upload/d398d81d5e27bfd2261e17dd557d874b.JPG/media/tinymce_upload/c220a05aafeedf90dd007d189eaddd7b.JPG/media/tinymce_upload/0872901c37b01b15fe4d7d14249939f3.JPG/media/tinymce_upload/8f74aa8efe7714d2df9bd6ebf44825f1.JPG/media/tinymce_upload/c829595541e1ba70787a87bf00b6e1e7.JPG/media/tinymce_upload/34e8717048c500617429182b4235388a.JPG/media/tinymce_upload/33ecd1387cbd0927af0b215a5a40c385.JPG/media/tinymce_upload/df31ec519a98ddb07b121f7e18fb9cc9.JPG

Link to comment
Share on other sites

Hi WTD

Yes destructive on the wallet due to per unit cost, but overall cost works out about the same per layout.

With a LT locomotive at least you can go undergtound if need be 😆 sure I have seen a picture of a steam freight coming out of the tube tunnels 

They did once run freight trains through there and with steam.

Looks good.

regards John

Link to comment
Share on other sites

I lack the imagination and artistic eye to reproduce the necessary lifelike effects Brian, so mine will be more ‘utility’ should we say.

My artistic gene was obviously dumped in favour of the engineering option.

Link to comment
Share on other sites

  • 2 weeks later...

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
×
  • Create New...