Jump to content

Postman On The Rails

Members
  • Posts

    518
  • Joined

  • Last visited

  • Days Won

    2

Posts posted by Postman On The Rails

  1. East Mallingford’s Civil Engineering Department has been busy today building some In The Greenwood kits together. Namely:

    1. Water Tower - Purchased to hide a turnout motor that wouldn’t fit underneath, just needs adjusting slightly to allow the rod to pass through.

    2. Double Terrace Low Relief - For back scene test build to see how many more would be needed.

    3. Large Signal Box - Was hoping to hide the leavers for the point motors, but unfortunately it wasn’t practical so East Mallingford Railway now has staff offices in a converted signal box.

    4. Footbridge Height Extension - Purchased not to extend the height, but as Station Steps and they work great.

    Over to Art & Design for painting.

     

    IMG_2653.jpeg

    IMG_2654.jpeg

    IMG_2655.jpeg

    IMG_2656.jpeg

    IMG_2657.jpeg

    IMG_2659.jpeg

    IMG_2660.jpeg

    IMG_2662.jpeg

    IMG_2663.jpeg

    IMG_2664.jpeg

    • Like 6
  2. Wanted an extra one for more play shunting so decided in March to get the Green 08 as an addition as the 6 pins were due around the same time, but I cant justify in my head having around £230 of locos just sat there without any enjoyment. It’s good they ask why you are cancelling your order so they know the reasons why. Maybe the blue on will be back by the time they turn up fingers crossed.

  3. I think by doing some analysis anything which is not due this year has dropped from the catalogue but is still available to pre-order. I assume to manage expectations. 

    • Like 2
×
  • Create New...