Hi all, just finished nailing all the track down and I have had a point fail. The link bar has come off so the rails wander about. This particular point is halfway round a 3 track layout and is where all 3 tracks link. I really dont want to pull up half the rails to replace this set of points. Can I slide the fishplates up the rails to give me room to lift the points?