Thanks folks. great advice. i do have some old steel track, that i inherited, but have been buying job lots of nickel silver. Ambition wise. its a big set of boards. but im just going at my pace, learning to craft scenery, card kits etc./media/tinymce_upload/75ee4f119eee08947f324509a159b746.jpg. its taken me 5 weeks just to start laying the track. planning the goods yard which will run into a double mainline beyond is a terminus station (ignore the platforms, just testing, to the far end (fairly straight forward, ) then it will loop 3/4 way round to a mainline station. the far end will also branch off to a coalmine and run coal trucks into the goods yard. Photo attached, this is now all joined up. The theme as you can maybe see is pre beeching steam. local services and freight only.