Charlie 66 Posted April 18 Share Posted April 18 So, after a couple of months work I have a functioning albeit not finished track. I've now started some modelling on the layout to mix up my activities a bit. Sadly one of my 2 loco's is causing problems short circuiting so I'm in the process of discussing a repair with Hornby. In the meantime: 12 Link to comment Share on other sites More sharing options...
Too Tall Posted April 18 Share Posted April 18 Looking good, a huge long space you have there too 😎 1 Link to comment Share on other sites More sharing options...
Charlie 66 Posted April 18 Author Share Posted April 18 34 minutes ago, Too Tall said: Looking good, a huge long space you have there too 😎 Thanks, it's going to be a long-term thing, which is fine. About 15ft long. Link to comment Share on other sites More sharing options...
Rallymatt Posted April 18 Share Posted April 18 Nice work! I notice you are using Peco track, I did a little video on sorting a lot of the ‘running issues’ that is mainly shorts etc. It’s almost entirely down to wheel back to back settings, get those in the right place and it’s ultra reliable running. Link to comment Share on other sites More sharing options...
Generic Hornby Username Posted April 18 Share Posted April 18 Very impressive! Keep us posted! 1 Link to comment Share on other sites More sharing options...
Charlie 66 Posted April 19 Author Share Posted April 19 21 hours ago, Rallymatt said: Nice work! I notice you are using Peco track, I did a little video on sorting a lot of the ‘running issues’ that is mainly shorts etc. It’s almost entirely down to wheel back to back settings, get those in the right place and it’s ultra reliable running. Thanks Rallymatt, I found your video which was very interesting. Unfortunately not the cause of shorts with Trigo though as it's been happening on straight tack sections too. However, the good news is I believe I have resolved it this morning - the pickups were catching somewhere around either the wheel axles or chassis - presumably having got slightly out of shape during that first 30 min run in. I have glued down the length of the pickups to their plastic casing so only the ends bend out to the wheel rims and it seems to have done the trick. I will be doing the back-to-back wheel alignment on all rolling stock when I can get a suitable tool around 10.35mm. Link to comment Share on other sites More sharing options...
Rallymatt Posted April 19 Share Posted April 19 (edited) I found a few companies sell Pin Gauges that you can get in a vast range of precise sizes. Not quite as simple to set as it is with a ‘square’ block but slip gauges don’t come in the sizes we want. The pick ups are very delicate, well done saving yours, my first WW had damaged ones from factory, I think they are very easy to damage in assembly. 👍 Edited April 19 by Rallymatt Spooling Link to comment Share on other sites More sharing options...
Charlie 66 Posted April 21 Author Share Posted April 21 On 19/04/2024 at 18:06, Rallymatt said: I found a few companies sell Pin Gauges that you can get in a vast range of precise sizes. Not quite as simple to set as it is with a ‘square’ block but slip gauges don’t come in the sizes we want. The pick ups are very delicate, well done saving yours, my first WW had damaged ones from factory, I think they are very easy to damage in assembly. 👍 Yeah I searched for slip blocks but they seemed to go in 0.1mm increments to around 8mm then only 0.5mm increments. Anyway, I'm now waiting on a pin gauge I've ordered and Trigo seems to be running fine now with the glued down pickups - apart from occasional jumping of the infamous front bogie. We'll get there. 1 Link to comment Share on other sites More sharing options...
Charlie 66 Posted May 4 Author Share Posted May 4 Quite pleased with progress, However, I ordered a load of "TT" gauge unpainted figures, only to discover they're 1:100 so a bit big. Now I've painted them, they look fine on the platforms until you put the train in front, then they make the carriages look too small. Lesson learned - beware products marked "TT" scale - don't do as I did and assume they're 1:120. 5 Link to comment Share on other sites More sharing options...
Rallymatt Posted May 4 Share Posted May 4 Ahhh that’s a common thing with the Chinese cheap figures, they can be any size except the one you want 🤣 Link to comment Share on other sites More sharing options...
Charlie 66 Posted May 13 Author Share Posted May 13 Finally got the wording done for the lights and installed the third platform of the terminus. This end of the layout is nearing completion with just all the little details to add: 8 Link to comment Share on other sites More sharing options...
RB51 Posted May 13 Share Posted May 13 That looks great, well done. R- 1 Link to comment Share on other sites More sharing options...
Charlie 66 Posted May 13 Author Share Posted May 13 Now starting on landscaping. First time I've used Peco Landform and I'm impressed. It's not as messy as I was anticipating. 5 Link to comment Share on other sites More sharing options...
Stephen-1260829 Posted May 13 Share Posted May 13 this is looking very good 1 Link to comment Share on other sites More sharing options...
Charlie 66 Posted May 13 Author Share Posted May 13 Couldn't find a suitable tunnel entrance for 3 tracks, so I've had to "adjust" this 2 track entrance. I think I'll get away with it when it's all decorated. 5 Link to comment Share on other sites More sharing options...
Charlie 66 Posted May 22 Author Share Posted May 22 First use of the rock moulds and quite pleased with the outcome 4 Link to comment Share on other sites More sharing options...
Charlie 66 Posted May 22 Author Share Posted May 22 Inspired by others and now 3 months into the hobby, I thought I'd post a quick vid. PXL_20240522_164510431.mp4 9 Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now