PJ_model_trains Posted February 9, 2014 Share Posted February 9, 2014 When RailMaster is started all points are set to the default setting. Is it possible to reset all points back to that position at any stage during use of the program without having to restart it? I have at present set up Manage Track Groups in Track Plan Designer and set up one called 'reset to start' where every point is listed to put them back to the default start positions. Link to comment Share on other sites More sharing options...
Fishmanoz Posted February 9, 2014 Share Posted February 9, 2014 That's the way to do it PJ. Link to comment Share on other sites More sharing options...
96RAF Posted February 10, 2014 Share Posted February 10, 2014 PJ_model_trains said: When RailMaster is started all points are set to the default setting. Is it possible to reset all points back to that position at any stage during use of the program without having to restart it? I have at present set up Manage Track Groups in Track Plan Designer and set up one called 'reset to start' where every point is listed to put them back to the default start positions. Seems like you answered your own question PJ Link to comment Share on other sites More sharing options...
gilbo2 Posted February 10, 2014 Share Posted February 10, 2014 PJ_model_trains said: When RailMaster is started all points are set to the default setting. Is it possible to reset all points back to that position at any stage during use of the program without having to restart it? I have at present set up Manage Track Groups in Track Plan Designer and set up one called 'reset to start' where every point is listed to put them back to the default start positions. OR, what I do is create a small program for setting the initial point positions. In my view much better as you have full control over the timings for the switching which can be much quicker. Link to comment Share on other sites More sharing options...
PJ_model_trains Posted February 10, 2014 Author Share Posted February 10, 2014 Fishmanoz said: That's the way to do it PJ. That was my way round it Fishy, I just wondered if there was a return to default button somewhere and I had missed it. Many thanks Link to comment Share on other sites More sharing options...
PJ_model_trains Posted February 10, 2014 Author Share Posted February 10, 2014 RAF96 said: Seems like you answered your own question PJ Thanks RAF96 I just worked my way round it with the system, I just wondered if there was a return to default button I had missed. Thanks for your reply Link to comment Share on other sites More sharing options...
PJ_model_trains Posted February 10, 2014 Author Share Posted February 10, 2014 dgilbert2 said: OR, what I do is create a small program for setting the initial point positions. In my view much better as you have full control over the timings for the switching which can be much quicker. Hi dgilbert2 Is the way I mentioned not the same? I didn't want to set a route just reset all the points to start up positions. PJ Link to comment Share on other sites More sharing options...
gilbo2 Posted February 10, 2014 Share Posted February 10, 2014 PJ_model_trains said: Hi dgilbert2 Is the way I mentioned not the same? I didn't want to set a route just reset all the points to start up positions. PJ No subtly different as a "program" gives you full control without the default point delays all the time. Start off by using the record function to switch all your points as required, better if you alternate through all your decoders to give the CDU's time to charge up, and then edit the timings. Link to comment Share on other sites More sharing options...
PJ_model_trains Posted February 11, 2014 Author Share Posted February 11, 2014 Thanks dgilbert2 I will test this method also. Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.